Remove Civil Engineering Remove Client Remove Diagram Remove Structural Engineering
article thumbnail

Garfield Center by TEF Design

aasarchitecture

First, as one of 15 parks funded by a bond measure, improving “access to safe and high-quality recreational facilities” was a fundamental objective of the client, the San Francisco Recreation and Parks Department (RPD). Diagram Sustainability. Photo © Bruce Damonte. Photo © Bruce Damonte. Photo © Bruce Damonte. Photo © Bruce Damonte.

article thumbnail

Daniel Joseph Chenin, Ltd. Construct Fort 137 Featuring Unobstructed Views of the Surround Desert and Canyons

Architizer

Fort 137 – The clients sought an environmentally conscious home with a direct relationship to its site to function as a base camp for their active lifestyle. In response, the residence is an open structure, organized into three layers, which radiate from a communal nucleus to a periphery of private zones. . Project Status: Built.

article thumbnail

Architectural Graphic Standards | Life of an Architect

Life of an Architect

The ball really falls when the structural engineer gets the CAD file from the architect and they just scrub items and add “stuff.” I should know, I am a structural engineer. Big thick black walls look great in parti diagrams. People known that an architect did these rather than an engineer, and 2.

Architect 111