Remove 2029 Remove Contract Remove Development Remove Real Estate
article thumbnail

Zentralklinikum Hochrhein, Albbruck, Baden-Württemberg

e-architect

The exemplary hospital building with around 360 beds should be completed in Albbruck by 2029 – as the centerpiece of the health park of the same name that is being realized simultaneously as a separate project. The signature of the contract means that all the requirements have been met for us to start the detailed design.

Concept 53