Remove 2029 Remove Construction Remove Roofing Remove Sustainability
article thumbnail

Aedas-designed Trojena Ski Village: a futuristic ski destination in NEOM

aasarchitecture

History is in the making as Saudi Arabia gears up to host the 10th Asian Winter Games in 2029 in Trojena, the Gulf Region’s first ever outdoor ski resort. Image © Aedas Exceptional views and play of natural light The ski village is divided into five major zones connected through the roof and ground floor.

Design 64
article thumbnail

The new Oslo Central Station by Reiulf Ramstad Arkitekter

aasarchitecture

Image © Reiulf Ramstad Arkitekter The station hall will get an architectural upgrade with a new roof covering the intersection of the different station buildings. This way the station will feel more open, with a timber construction supporting skylights that fill the hall with sunlight. Source by Reiulf Ramstad Arkitekter.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MAD Architects unveils Nanhai Art Center

aasarchitecture

Sustainability and green carbon reduction are fully integrated into the design concept from the start and form a narrative of building technology and innovation. Image © MAD Architects The top of the platform serves as a pedestrian space leading to the cultural spaces entrances. Site Area: Approx. 59,455 sqm Building Area: Approx.

Art 59
article thumbnail

Zaha Hadid Architects wins competition for the development of Zugló City Centre

aasarchitecture

Developed in phases by Bayer Construct Group in Hungary, the project will begin construction early next year and is scheduled for completion in 2029. The project will create one of the greenest and most sustainable neighborhoods on the Pest side of the capital. Image © Zaha Hadid Architects.

article thumbnail

Zentralklinikum Hochrhein, Albbruck, Baden-Württemberg

e-architect

The exemplary hospital building with around 360 beds should be completed in Albbruck by 2029 – as the centerpiece of the health park of the same name that is being realized simultaneously as a separate project. be AG enjoys an important USP in the sustainability sector in the shape of its “2226” constructional principle.

Concept 53