Remove 2028 Remove Construction Remove Landscape Remove Safety
article thumbnail

Carlo Ratti Associati proposes replacement for collapsed Baltimore bridge

Deezen

In collaboration with structural engineer Michel Virlogeux and the construction group Webuild , the proposed design will feature primary support pillars "well away from the navigation channel used by large vessels". This means it's more material-efficient and ultimately sustainable, according to the team. "In The images are by Brick Visual.

article thumbnail

Franklin Boulevard Transformation: 2023 Update

SW Oregon Architect

Speed limits on the urban portions of Franklin Boulevard reduced from 35 to 25 mph (speed control through the corridor would be achieved with modifications to the roadway geometrics, speed cushions at crosswalk locations, and landscape treatments). The City foresees reconstruction of Franklin Boulevard being completed by 2028.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SOM unveils design for Singapore's first supertall skyscraper

Deezen

The studio added that engineered bamboo will be used for some aspects of the construction, though no specific details were given. SOM also emphasized the "post-pandemic" aspects of the tower, which it said has a focus on the health and safety of the occupants. The skyscraper has a prospective completion date of 2028.

Design 109
article thumbnail

UK Climate Change Policy comment

e-architect

There’s a four to one benefit when construction exceeds the International Code Council’s 2015 model building codes. This means costing carbon into construction and creating net zero designs for homes and offices, that maximise public health and safety, whilst safeguarding against environmental hazards.