Remove 2027 Remove Engineering Remove Information Remove Site
article thumbnail

Laherrère centre Pau, France building

e-architect

Renovations, demolitions and landscaping projects aimed at requalifying collective spaces at the foot of buildings are scheduled until 2027. The primary intention of the project was to constitute a real living space, on the model of a village square, like the market that the site has hosted since the beginning of the work.

article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Industrialized construction High-volume off-site construction, prefabrication, and on-site construction automation will continue to advance in response to ongoing labor and material challenges. Brian Leavitt, Director of Electrical Engineering 6. Mike Zorich, Vice President of Healthcare 5. Gary Bireta, Project Executive 12.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Jeddah Rose Building, Downtown

e-architect

Major urban project plays a critical role as a gateway into the new urban area with a first phase completion in 2027. • Slated to open in 2024, it will be their largest to date in advance of the first phase of New Jeddah Downtown set for 2027. Jeddah Rose, KSA – Building Information. Site Area: 8,375 sqm.

article thumbnail

Singapore’s new Science Centre by Zaha Hadid Architects

aasarchitecture

Singapore’s Science Centre Board has unveiled the design of the new Science Centre which will provide unique facilities and programmes as a destination for all Singaporeans to access science, technology, engineering and mathematics (STEM) education and experiences. Image © Zaha Hadid Architects (ZHA).

article thumbnail

The Diego Rivera Theater, San Francisco, California

e-architect

Site Area: 93,000 SFT Floor Area: 77,000 SFT Building Height: 70 FT Number of floors: 3 Notable Sustainability Facts: Targeting LEED Gold with displacement HVAC in the auditorium, radiant floor heating and cooling, and an extensive stormwater filtration and retention system.

article thumbnail

CHYBIK + KRISTOF unveil design for a Multipurpose Skyscraper in Ostrava’s City Center

aasarchitecture

Over the course of the last three decades, Ostrava has transitioned from a coal-mining and metallurgical city to a service and information-driven industry requiring the urban landscape to transition and adapt to this new rapidly growing cultural economy. Image © CHYBIK + KRISTOF. Image © CHYBIK + KRISTOF.

Cities 52
article thumbnail

CHYBIK + KRISTOF unveil design for a Multipurpose Skyscraper in the heart of Ostrava’s City Center

aasarchitecture

Over the course of the last three decades, Ostrava has transitioned from a coal-mining and metallurgical city to a service and information-driven industry requiring the urban landscape to transition and adapt to this new rapidly growing cultural economy. Image © CHYBIK + KRISTOF. Image © CHYBIK + KRISTOF.

Cities 52