Remove 2027 Remove Commercial Remove Masterplanning Remove Zoning
article thumbnail

gmp wins competition for the ThyssenKrupp Schulte site

aasarchitecture

The project is one of the nine sections of the urban and landscape masterplan for the Diebsteich area. The Altona main line station is to be relocated here by 2027, which will fundamentally change the area. Along Waidmannstrasse, a building with offices and commercial facilities will be the third module.

Site 52
article thumbnail

THE BeCa Old Kent Road homes, South London

e-architect

THE BeCa and the Ruby Triangle masterplan form a key part of the area’s ongoing regeneration and a prime investment opportunity. commercial space on the ground floor which will include a gym. for POL and PCL until 2027, this is an investment opportunity not to be missed!” Set on a 1.6-acre

Home 57
article thumbnail

100 Women to Watch in Architecture

Architizer

The firm’s designs for the Hamedan Chamber of Commerce , slated to be built in 2027, took home both a Popular and a Jury A+Award in 2018 in the unbuilt institutional category. Urban-oriented design is the thread that unites their portfolio of mainly commercial commissions. Anita Bulloni. Rossana Hu. Dasha Khapalova.