Remove 2027 Remove Client Remove Masterplanning Remove Site
article thumbnail

gmp wins competition for the ThyssenKrupp Schulte site

aasarchitecture

The project is one of the nine sections of the urban and landscape masterplan for the Diebsteich area. The Altona main line station is to be relocated here by 2027, which will fundamentally change the area. ha project site plays a key role. In this context, the 4.7 Source by gmp.

Site 52
article thumbnail

MAD models "futuristic" cruise terminal in China on gantry cranes

Deezen

The 65,000-square-metre complex, which was the winning entry of an international competition for the scheme, is hoped to transform the industrial site into usable public space. It will begin construction in November 2022, replacing an existing cargo terminal on the same spot, for completion in 2027. Associate in charge: Liu Huiying.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Grant Associates, British Landscape Architects

e-architect

We would like to pass on our sincere thanks to our clients for their continuous support, to our fellow consultants for the inspiring collaborations and to our staff for their dedication and enthusiasm throughout the design process. New Singapore Science Centre to open in 2027. Cherrywood Village Masterplan. 13 Dec 2022.

article thumbnail

100 Women to Watch in Architecture

Architizer

The firm’s designs for the Hamedan Chamber of Commerce , slated to be built in 2027, took home both a Popular and a Jury A+Award in 2018 in the unbuilt institutional category. It’s not hard to see why: with a design built on mathematical principles inspired by the legacy of Persian geometric theory, this complex exudes rationality and order.