Remove 2027 Remove Client Remove Estimating Remove Site
article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

It is a great joy and honor to work on a performing arts center for the students of this historic university on such an important site,” Steven Holl remarks. The Student Performing Arts Center is expected to begin construction in fall of 2024 with anticipated occupancy in winter 2027. The REACH Expansion at the John F.

article thumbnail

The Diego Rivera Theater, San Francisco, California

e-architect

Site Area: 93,000 SFT Floor Area: 77,000 SFT Building Height: 70 FT Number of floors: 3 Notable Sustainability Facts: Targeting LEED Gold with displacement HVAC in the auditorium, radiant floor heating and cooling, and an extensive stormwater filtration and retention system.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Grant Associates, British Landscape Architects

e-architect

We would like to pass on our sincere thanks to our clients for their continuous support, to our fellow consultants for the inspiring collaborations and to our staff for their dedication and enthusiasm throughout the design process. New Singapore Science Centre to open in 2027. 13 Dec 2022. 1 Dec 2022. 23 Apr 2021. 30 May 2019.

article thumbnail

100 Women to Watch in Architecture

Architizer

The firm’s designs for the Hamedan Chamber of Commerce , slated to be built in 2027, took home both a Popular and a Jury A+Award in 2018 in the unbuilt institutional category. It’s not hard to see why: with a design built on mathematical principles inspired by the legacy of Persian geometric theory, this complex exudes rationality and order.