Remove 2027 Remove Client Remove Engineering Remove Site
article thumbnail

WIlliams College Museum of Art by SO – IL

aasarchitecture

Image © SO – IL A courtyard garden at the heart of the museum centers nature on the site, drawing daylight into the interior. Engineered via an experimental technique in warped Cross Laminated Timber, the roof will be the first of its kind in North America. The museum’s design adheres to the rigorous Living Building Challenge 4.0/Core

Art 59
article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

It is a great joy and honor to work on a performing arts center for the students of this historic university on such an important site,” Steven Holl remarks. The Student Performing Arts Center is expected to begin construction in fall of 2024 with anticipated occupancy in winter 2027. The REACH Expansion at the John F.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Industrialized construction High-volume off-site construction, prefabrication, and on-site construction automation will continue to advance in response to ongoing labor and material challenges. Brian Leavitt, Director of Electrical Engineering 6. Wally Ford, Client Executive, Structural 9.

article thumbnail

Laherrère centre Pau, France building

e-architect

Renovations, demolitions and landscaping projects aimed at requalifying collective spaces at the foot of buildings are scheduled until 2027. The primary intention of the project was to constitute a real living space, on the model of a village square, like the market that the site has hosted since the beginning of the work.

article thumbnail

Jeddah Rose Building, Downtown

e-architect

Major urban project plays a critical role as a gateway into the new urban area with a first phase completion in 2027. • Slated to open in 2024, it will be their largest to date in advance of the first phase of New Jeddah Downtown set for 2027. Client: Al-Ameen Real Estate, the real estate development arm of Al Nahla Group.

article thumbnail

The Diego Rivera Theater, San Francisco, California

e-architect

Site Area: 93,000 SFT Floor Area: 77,000 SFT Building Height: 70 FT Number of floors: 3 Notable Sustainability Facts: Targeting LEED Gold with displacement HVAC in the auditorium, radiant floor heating and cooling, and an extensive stormwater filtration and retention system.

article thumbnail

Bjarke Ingels Group (BIG) wins international architectural competition for the design of the Vltava Philharmonic Hall

ArchiDiaries

The site for the philharmonic hall currently complicates the opportunity for people to meet instead of encouraging it, so the emphasis was not only on the architecture and operation of the building, but also on the design of the public spaces in the surrounding area. Client’s website: www.iprpraha.cz, www.praha.eu. About studio.