Remove 2027 Remove Client Remove Commercial Remove Site
article thumbnail

gmp wins competition for the ThyssenKrupp Schulte site

aasarchitecture

The Altona main line station is to be relocated here by 2027, which will fundamentally change the area. ha project site plays a key role. Along Waidmannstrasse, a building with offices and commercial facilities will be the third module. In this context, the 4.7 Source by gmp.

Site 52
article thumbnail

MAD models "futuristic" cruise terminal in China on gantry cranes

Deezen

Developed by MAD with the China Academy of Building Research (CASR) for Cuntan Port on the Yangtze River, the scheme marries an international cruise terminal with commercial spaces. It will begin construction in November 2022, replacing an existing cargo terminal on the same spot, for completion in 2027.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Jeddah Rose Building, Downtown

e-architect

. • Major urban project plays a critical role as a gateway into the new urban area with a first phase completion in 2027. • Jeddah, Saudi Arabia — the Los Angeles and Beirut-based architecture firm PARALX announced that Jeddah Rose, a ten-story mixed-use commercial and hospitality building, has topped out. Site Area: 8,375 sqm.

article thumbnail

Chongqing Cuntan International Cruise Centre

e-architect

The project site, currently a cargo terminal covering 66,000 square meters, is located in Chongqing’s Liangjiang New Area. The site and associated cruise terminal sit within the Cuntan Port area, allowing access to the Yangtze River. Site area: 66,000 sqm. Commercial: 50,000 sqm. Beijing, China – Jan.13th,

article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Industrialized construction High-volume off-site construction, prefabrication, and on-site construction automation will continue to advance in response to ongoing labor and material challenges. Under the right circumstances, the revolutionary building method can reduce commercial high-rise construction time by one-fourth or more.

article thumbnail

Gantry crane by MAD wins competition for Chongqing Cuntan International Cruise Centre

aasarchitecture

The project site, currently a cargo terminal covering 66,000 square meters, is located in Chongqing’s Liangjiang New Area. The site and associated cruise terminal sit within the Cuntan Port area, allowing access to the Yangtze River. Client: Chongqing Cuntan International Cruise Home Port Development Co. Source by MAD.

article thumbnail

Gantry crane by MAD wins competition for Chongqing Cuntan International Cruise Centre

aasarchitecture

The project site, currently a cargo terminal covering 66,000 square meters, is located in Chongqing’s Liangjiang New Area. The site and associated cruise terminal sit within the Cuntan Port area, allowing access to the Yangtze River. Client: Chongqing Cuntan International Cruise Home Port Development Co. Source by MAD.