Remove 2027 Remove Civil Engineering Remove Clients Remove Construction
article thumbnail

13 trends, technologies, and strategies to expect in 2023

BD+C

Industrialized construction High-volume off-site construction, prefabrication, and on-site construction automation will continue to advance in response to ongoing labor and material challenges. Wally Ford, Client Executive, Structural 9. Edwin Najarian, Client Executive, Structural 13.

article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

The Student Performing Arts Center is expected to begin construction in fall of 2024 with anticipated occupancy in winter 2027. The new Center continues Steven Holl Architects’ portfolio of performing arts and cultural venues that serve as community gateways. The REACH Expansion at the John F.

article thumbnail

WIlliams College Museum of Art by SO – IL

aasarchitecture

Image © SO – IL Location: Williamstown, MA, USA Architect: SO – IL SO – IL Executive Team: Florian Idenburg, Jing Liu, Kevin Lamyuktseung, Jonathan Molloy SO – IL Design Team: Florian Idenburg, Jing Liu, Kevin Lamyuktseung, Jonathan Molloy, Doh Lee, Andrea Fos, Marlena Fauer, Sean Broadhurst, William Dolin, Diana Smiljkovic, Yi Wang Executive Architect: (..)

Art 59