Remove 2025 Remove Construction Remove Estimating Remove Site
article thumbnail

Brandon Haw Architecture creates masterplan for "last waterfront site" in Williamsburg

Deezen

acres, Williamsburg Wharf will encompass residential, commercial, retail, and outdoor space and be located on "the last waterfront site in South Williamsburg" with each tower reaching 22 storeys. The project shall regenerate the last waterfront site of South Williamsburg."

article thumbnail

Sagrada Familia announces 2026 final completion date

Deezen

Construction on the Sagrada Familia began in 1882 and was led by Gaudí until his passing in 1926. The Chapel of the Assumption is expected to be finished in 2025 and the tower of Jesus Christ in 2026," La Sagrada Familia Foundation told news site CNN. Prefabricated elements are being used to speed up the building's construction.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Populous unveils plan to revamp horse-racing track in New York

Deezen

The white building will be shaded by a cantilevered roof The redevelopment project also extends to the barn and backstretch areas, with the construction of three new dormitories and bicycle-storage sheds to encourage multi-modal travel. Renovated spaces will include an on-site medical facility, recreation hall, track kitchen and gymnasium.

Events 124
article thumbnail

Sasaki completes waterfront transformation and public park in the Port of Los Angeles

Deezen

Set between the existing Banning's Landing Community Center and a future restaurant site, the Waterfront Promenade is approximately 1,300 linear feet (396 metres) of pedestrian boardwalk. Quality control and cost estimating: Integrated Engineering Management Marine and electrical engineer: Moffatt & Nichol MEP: P2S Inc.

article thumbnail

Manica designs glass-fronted stadium for Chicago Bears

Deezen

The stadium and associated campus improvements will be "one of the largest construction projects in Illinois history," while the stadium and associated improvements will "add open space, improve accessibility, and provide Chicago families and tourists a safe place to gather year-round", according to the architecture studio.

Glass 122
article thumbnail

Competitions: Construction of an Innovation Campus - iXcampus

Bustler

Today iXcampus is taking on a new challenge: to double the surface area of the campus in order to accommodate 1,200 students and 900 employees in 2025. estimated envelope : € 40,000,000 surface to create : 16,000 sqm Read the full post on Bustler.

article thumbnail

Dairy Apartments Portland, Oregon

e-architect

Currently under construction, this residential property project’s estimated completion is March 2025. The resulting design includes two 7-story housing bars on a full-block, 2-story podium arranging ground-floor residential and amenity spaces around a central private courtyard.