Remove 2025 Remove Civil Engineering Remove Structural Engineering Remove Sustainability
article thumbnail

Westchester Square Library by Snøhetta

aasarchitecture

Location: New York, NY, USA Architect: Snøhetta Civil Engineer: Thornton Tomasetti Structural Engineer: Silman Sustainability Consultant: Atelier 10 MEP Engineer: Altieri Year: 2025 Images: Courtesy of Snøhetta. These elements go above and beyond current energy code requirements. Source by Snøhetta.

article thumbnail

MAD unveils sunken Train Station in the Forest in Jiaxing

Deezen

million people a year by 2025, was increased from five tracks to six tracks. Through careful traffic planning and employing a vertical use of space, our scheme meets the station's existing passenger demand while leaving room for future sustainable development and expansion," it added.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Ground granulated blast furnace slag in concrete production

e-architect

GGBS in concrete production A group of 13 experts from across structural engineering, concrete and cement industries, construction, academia, and civil society have collaborated on a paper that reviews the use of ground granulated blast furnace slag (GGBS) in concrete, and examining ways that this may change in the future.

article thumbnail

Steven S Wymer Hall, University of Illinois Urbana-Champaign, USA

e-architect

Design Years: 2022-2023 Construction Years: 2023-2025 Major Building Materials: Concrete structure, brick, natural stone, natural metals, and glass Program: The Steven S. Wymer Hall University of Illinois Urbana-Champaign Location: 503 Gregory Drive Champaign, IL 61820 Client: University of Illinois Urbana-Champaign.

article thumbnail

University High School California Street Campus by Leddy Maytum Stacy Architects

aasarchitecture

The California Street Campus is targeting Net -Zero Energy, becoming a teaching tool for a sustainable future. Under construction, the project’s estimated completion date is Spring 2025. Source by Leddy Maytum Stacy Architects.