Remove 2025 Remove Civil Engineering Remove Construction Remove Estimating
article thumbnail

Sasaki completes waterfront transformation and public park in the Port of Los Angeles

Deezen

Swinging benches connect the Waterfront Promenade to the Bluff Other ongoing projects in Los Angeles include a proposed expansion of The Broad museum by Diller Scofidio + Renfro, which is set to break ground in 2025, and the amorphous construction of the Lucas Museum of Art by MAD, which is slated to be complete next year.

article thumbnail

Dairy Apartments Portland, Oregon

e-architect

Currently under construction, this residential property project’s estimated completion is March 2025. The resulting design includes two 7-story housing bars on a full-block, 2-story podium arranging ground-floor residential and amenity spaces around a central private courtyard.

article thumbnail

University High School California Street Campus by Leddy Maytum Stacy Architects

aasarchitecture

Under construction, the project’s estimated completion date is Spring 2025. The California Street Campus is targeting Net -Zero Energy, becoming a teaching tool for a sustainable future. Source by Leddy Maytum Stacy Architects.