Remove 2025 Remove Cities Remove Commercial Remove Masterplanning
article thumbnail

Brandon Haw Architecture creates masterplan for "last waterfront site" in Williamsburg

Deezen

Local studio Brandon Haw Architecture has created a masterplan for a development along the Brooklyn waterfront which will include five mixed-use towers created by design studios CookFox Architects , Rockwell Group and more. Construction has begun on the project, with its first phase estimated to be completed in 2025.

article thumbnail

10 Design set to top Shenzhen mall with indoor ski slope

Deezen

Slated to open in 2025, the development will include a hotel , shopping mall , office space , and an indoor ski slope with an undulating shape that rises over the other functions. 10 Design wants the venue to connect people and businesses A hotel connected to the snow centre will contain a ballroom with panoramic views of the ski slope.

Design 133
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

An immersive mixed-use urban oasis in Tongzhou by Aedas

aasarchitecture

As a focal point of Beijing urban development, Zhangjiawan is well-connected with transportation system Aedas has masterplanned the whole depot and carried out architectural design for the retail podium and hotel nearby.

article thumbnail

THE BeCa Old Kent Road homes, South London

e-architect

The first residents are due to move in late 2024, with site completion scheduled for Q1 2025. THE BeCa and the Ruby Triangle masterplan form a key part of the area’s ongoing regeneration and a prime investment opportunity. commercial space on the ground floor which will include a gym. Set on a 1.6-acre

Home 57
article thumbnail

Nanhai Development Guangzhou Jinghu Avenue Retail

e-architect

With an irregular architectural volume, the retail podium has a large massing placed on the plot that could cause a huge impact on the city. Therefore, reducing the sense of oppression brought by its mega-structure to the city is one of the biggest challenges in this project. Masterplanning, Design and Project Architect: Aedas.

article thumbnail

The ‘O’ by MVRDV revealed in Franklin Mitte, Mannheim

aasarchitecture

The 15-storey building mixes 120 apartments with ground level commercial units and a bar and terrace. The masterplan for Franklin Mitte, which combines a mixture of different building types and uses on a 41-hectare site, incorporates a number of elements from MVRDV’s masterplan proposal for the same site.

article thumbnail

LWK + PARTNERS wins competition for DIFC Living and Innovation Two

aasarchitecture

The project broke ground in November 2022 and is expected to be completed by 2025. The team devised creative and innovative solutions to facilitate multiple access points that prioritise security without hindering the connectivity and flow of the existing DIFC masterplan.