Remove 2024 Remove Civil Engineering Remove Site Remove Students
article thumbnail

Five design projects completed by students at Arts University Bournemouth

Deezen

Dezeen School Shows: an outdoor exhibition located in a shipping container is included in Dezeen's latest school show by students at Arts University Bournemouth. IAD live briefs offer students the opportunity to work on actual projects for real clients or organisations.

Students 112
article thumbnail

Student Performing Arts Center by Steven Holl Architects

aasarchitecture

The University of Pennsylvania announces Steven Holl Architects’ design for a new $75 million, 37,300-square-foot Student Performing Arts Center. It is a great joy and honor to work on a performing arts center for the students of this historic university on such an important site,” Steven Holl remarks.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Competitions: High School Design for Kharkiv, Ukraine

Bustler

Registration Deadline: Jan 24, 2024; Submission Deadline Feb 1, 2024 Contents of the competition The NPO Asian Institute of Low Carbon Design (AILCD) is pleased to invite students and young architects aged under 35 from all over the world to take part in the 13 th AILCD International Architecture Design Competition.

article thumbnail

Bristol Zoo Gardens Clifton homes

e-architect

The plans were submitted by Bristol Zoological Society, who have owned and managed the 12-acre Clifton site since it first opened in 1836. At the old zoo site in Clifton, some of the most iconic buildings will be sensitively restored and converted, with care taken to maintain their heritage features.

Home 52
article thumbnail

Steven S Wymer Hall, University of Illinois Urbana-Champaign, USA

e-architect

The project will provide a rich experience for the residential students and enhance the online experience for remote students. Construction broke ground on April 14, 2023, and the project is expected to be completed by December 2024. Site Area: 73,342 SFT (6,814 s.m.). Total Floor Area: 97,789 SFT (9,085 s.m.).

article thumbnail

Home Forward Killingsworth by Hacker

aasarchitecture

The site also houses PCC’s new Opportunity Center and a childcare center—both of which will be resources for residents. A public plaza connects the two projects with a space to host community gardens, job fairs, farmer’s markets, and other neighborhood gatherings that serve residents and PCC students. Image © Hacker. Source by Hacker.

article thumbnail

Aviva Studios in Manchester to Open on 18th October 2023

e-architect

Image Credit: OMA The new building is located in the new St John’s neighbourhood which is being developed on the site of the former Granada Studios next to the River Irwell and will make a major contribution to the ongoing regeneration of this part of the city centre. Image Credit: Pawel Paniczko Project Specifications Site: 1.80

Art 79