Remove 2021 Remove Civil Engineering Remove Clients Remove Roofing
article thumbnail

Field Architecture clads flowing Sonoma house in copper

Deezen

California studio Field Architecture designed this Sonoma Valley house out of a trio of fanning copper-clad pavilions with butterfly roofs. Palo Alto-based Field Architecture designed the home around the presence and absence of water in the unique microclimate, with the project completed in 2021. the studio said.

article thumbnail

John Friedman and Alice Kimm include dining room crane in Los Angeles house

Deezen

John Friedman Alice Kimm Architects (JFAK) completed the house – and 540-square foot (50-square metre) accessory dwelling unit (ADU) – in November 2021. We could do whatever we want, and we did in fact integrate some ideas and elements that other clients turned down for their particular houses." The photography is by Benny Chan.

Housing 98
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

VAVA House Seattle, Washington

e-architect

December 22, 2021. Located in Seattle , Washington, the clients asked Fivedot to design a house that reinforced a connection to their neighbors and their new community. The house also has a green roof, extensive solar panels, and utilizes previous concrete to reduce any runoff. Structural Engineer: Swenson Say Faget.

Housing 82
article thumbnail

Strang Design tops Miami mansion with slatted volume and planter

Deezen

The studio, which specializes in projects along Florida's vast coastline dedicated to "environmental modernism", completed the expansive, 8,500-square foot (2,590-square meter) house – known as the Angel Oaks Residence – in 2021. Civil engineer: Jorge G. Angel Oaks Residence is located in Miami The five-bedroom, 7.5-bathroom

article thumbnail

Barrow House, Lincolnshire Property

e-architect

Located in the Lincolnshire Wolds Area of Outstanding Natural Beauty (AONB), this stunning, partially subterranean private property has scooped multiple prestigious awards including the celebrated Grand Designs House of the Year Longlist 2021, which featured on Channel 4. Principal Contractor: CLS Civil Engineering.

Housing 52
article thumbnail

ZGF transforms Pittsburgh Ford Assembly plant into research facility

Deezen

Completed in 2021, The Assembly is a 534,366-square foot (50,000-square metre), LEED Gold-certified campus for researchers from the University of Pittsburgh Medical Center's (UMPC) Hillman Cancer Center, one of the world's leading cancer treatment and research facilities. MEP engineers + lighting: Affiliated Engineers, Inc.

article thumbnail

Century 21 rehabilitation by TEF Design

aasarchitecture

TEF Design recently completed concept designs for the shell and core base building rehabilitation of the landmark structure, including envelope improvements, complete roof replacement, and structural retrofit to transform the former theater for contemporary commercial use. The Century 21 rehabilitation is expected to be completed in 2025.