Remove 2017 Remove Contract Remove Engineering Remove Estimating
article thumbnail

Maryland's Key Bridge Response - A Story of Resolve, Achievement and Reverse Engineering

Community Architect

Other key parties involved in the recovery are the Army Corps of Engineers and the Coast Guard. In addition, 553 contract specialists are actively involved in various roles related to dive, crane, and vessel operations. The estimate for the overall weight of the fallen bridge is 27,000 tons. Coast Guard.

article thumbnail

Grant Associates, British Landscape Architects

e-architect

17 Nov 2017. 1 Nov 2017. The developer’s vision is to create a new neighbourhood with a unique character, including landscape and public realm, that draws on the site’s rich aviation and engineering history. 10 Aug 2017. Design: Glenn Howells Architects / Maccreanor Lavington Architects / ShedKM / Grant Associates.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

100 Women to Watch in Architecture

Architizer

This willingness to put things together in an unorthodox way is reflected in the firm’s 2017 project Square House , a 2018 Jury Winner in the A+Awards in the Private House Category. Mexican architect Tatiana Bilbao was a special honoree at the 2017 A+Awards , winning the Impact Award for her work designing affordable and sustainable housing.

article thumbnail

Architecture Articles: Building Design

e-architect

Beautiful wall texture bedrooms renovation design ideas Best reasons to buy a day bed 4 Colour Combinations To Enhance Your Bedroom Modern Versus Contemporary Bedroom Designs Essentials things for a perfect master bedroom Things to consider before buying Lori wall beds How to decorate your bedroom in a sexy way Touches of Glamour for your Bedroom Perfect (..)

article thumbnail

Why after 20 years EBDI is still no success story

Community Architect Daily

The fuel for going big was supposed to come from a Hopkins biotechnology park and "life sciences", an engine strong enough that it would leverage new and healthy housing as an adjunct. The total redevelopment was estimated to cost near $2billion (2003). This, of course, is totally different than healing an existing community.

article thumbnail

How to Invite More Demolition by Neglect: The sad case of the Hendler's Creamery

Community Architect Daily

A new floor was also inserted in the former engine room. Bill Pencek, former Deputy State Historic Preservation Officer in written testimony to CHAP) Another strangeness of the CHAP demolition approval was that they blindly accepted the findings of an engineer that the Helping Hand non-profit has commissioned, ie.

Roofing 68