Sat.Oct 13, 2018 - Fri.Oct 19, 2018

article thumbnail

3D scanning data provides solutions for challenging tilt-up panel casino project

BD+C

Jaynes Corp., a premier general contracting firm with locations in New Mexico and Colorado, eschewed traditional methods and instead used state-of-the-art 3D scanning technology to document the location of rebar in tilt-up panels at the Albuquerque, New Mexico, Sandia Casino and Resort. The project included a 28,000-sq-ft, two-story office complex adjacent to the main casino.

Project 198
article thumbnail

010: What Makes You a Designer

Life of an Architect

There are many things I do during a typical day – designing “stuff” is just one very small portion – but I still consider myself a designer more so than a project architect. Since I work at a smallish firm, everyone wears many hats and nobody has just one task or label. To be considered a designer just means you need to think about the design of everything – and I mean everything.

Design 86
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

EntreArchitect Behind The Design 010: House on Kona Coast by Dynerman Architects

EntreArchitect

EntreArchitect: Behind the Design is a continuing blog series where we feature work designed, developed and/or built by small firm entrepreneur architect members of The EntreArchitect Community. Want to have YOUR best work featured here at EntreArchitect? Click here to learn how. House on Kona Coast by Dynerman Architects. Project Name. House on Kona Coast.

article thumbnail

Green, and then some: Architecture firms are helping cities raise the stakes in green design

BD+C

Cities and counties around the country are taking sustainability to new heights—and architecture firms are helping them raise the stakes in green design. San Diego and New York are among a growing number of local jurisdictions that are expanding the scope of their energy- and water-use requirements for new construction. The County of San Diego has committed to making all new buildings achieve zero net energy—preferably to produce more energy than they consume through on-site energy generation.

article thumbnail

Architectural Visualization Trends and the Rise of AI

A new industry study conducted by Architizer on behalf of Chaos Enscape surveyed 2,139 design professionals to understand the state of architectural visualization and what to expect in the near future. We asked: How are visualizations produced in your firm? What impact does real-time rendering have? What approach are you taking toward the rise of AI?

article thumbnail

USGBC survey suggests employees are happier, healthier, and more productive in LEED green buildings

BD+C

According to a new recently released survey from the U.S. Green Building Council (USGBC), employees who work in LEED-certified green buildings are happier, healthier, and more productive than employees in conventional and non-LEED buildings. The survey also shows that a majority of office workers want to work for companies that are value-oriented, take stances on important issues like sustainability, and do their part for making a positive difference in the world.

Building 104

More Trending

article thumbnail

Green building is now academia's core

BD+C

As students returned to college campuses this fall, many were greeted by new, renovated, or expanded classrooms, research centers, and residences that operate more efficiently and sustainably.

article thumbnail

Construction continues to be vulnerable to cyberattacks

BD+C

Construction was among the top five business sectors targeted by cyberattacks in the second quarter of 2018, according to the latest “ threat report ” released earlier this month by eSentire, the largest pure-play managed detection and response service provider.

article thumbnail

Design revealed for mass-timber residential tower in Milwaukee

BD+C

“Ascent” is the apt name of what would be the tallest mass-timber building in the Western Hemisphere, a 21-story 410,000-sf mixed-use tower that would be located in downtown Milwaukee, Wis. A Building Team that includes the engineering firm Thornton Tomasetti, Korb + Associates Architects, and the developer New Land Enterprises has unveiled the design of Ascent, which is currently in its planning stages but could start construction by the fall of 2019.

article thumbnail

Earthquake-resistant library rises in Christchurch, New Zealand

BD+C

In 2011, a major earthquake killed 185 people in Christchurch, New Zealand as a result of collapsed buildings and falling masonry. As the city has been rebuilt over the course of the following decade, nine projects were identified as vital to the redevelopment of the city center.

Cities 89
article thumbnail

From Plan to Reality: Unlocking the Power of Aerial Imagery for AEC

Aerial imagery has emerged as a necessary tool for architecture, engineering, and construction firms seeking to improve pre-construction site analysis, make more informed planning decisions, and ensure all stakeholders have access to an accurate visualization of the site to keep the project moving forward. Download our guide and take a deeper look at how aerial imagery can be leveraged to drive project efficiency by reducing unnecessary site visits and providing the accurate details required to

article thumbnail

New Disaster Recovery Reform Act will support adoption of updated building codes

BD+C

The U.S. Congress recently passed the Disaster Recovery Reform Act (DRRA) and the Supplemental Appropriations for Disaster Relief Act.

article thumbnail

Metal mesh lends 'natural, chill vibe' to South Austin rental complex

BD+C

The in-house design team at PSW Homes, Austin, Texas, had already used a leaf motif on murals in the first two buildings of the 104-unit Thornton Flats luxury apartments, in South Austin. But the architects wanted a graphic treatment with a lot more pop for the third building in the complex.

Nature 78
article thumbnail

The Rhode Island School of Design receives its first new residence building in 30 years

BD+C

It has been 30 years since the Rhode Island School of Design (RISD) received a new student residence building, but that is about to change as Shawmut Design and Construction has recently broken ground on a new 43,500-sf residence hall on the Providence campus.

IT 75
article thumbnail

3D scanning data provides solutions for challenging tilt-up panel casino project

BD+C

Jaynes Corp., a premier general contracting firm with locations in New Mexico and Colorado, eschewed traditional methods and instead used state-of-the-art 3D scanning technology to document the location of rebar in tilt-up panels at the Albuquerque, New Mexico, Sandia Casino and Resort. The project included a 28,000-sq-ft, two-story office complex adjacent to the main casino.

Project 75
article thumbnail

7 Ways Real-Time Visualization Can Solve Architectural Challenges

In the dynamic world of architecture, design, and construction, creative problem-solving is crucial for success. Traditional methods often fall short in effectively conveying design intent to clients. Real-time visualization empowers you with a solid decision-making tool that smooths the design process. Discover the power of real-time visualization: Effective Communication Convey your vision clearly and align with clients.

article thumbnail

Open design on the rise

BD+C

With a new project on the horizon for Canada’s largest telecom, local structural engineering firm, Glotman-Simpson had an idea: The use of long-span composite steel decking could be ideal for such a large-scale project, contributing to an open, column-free design. So, they brought the idea to the attention of the architecture firm, Henriquez Partners.

article thumbnail

Dead lobby syndrome: An affliction only experience can cure

BD+C

Think about the building where you go to work every day. Are you inspired when you walk in the front door? Are you enticed to explore or investigate? Is there a place to stop and spend time with a friend or colleague? If pressed, could you even describe what the space looks like? If any of these questions left you wondering, your building may have Dead Lobby Syndrome.

article thumbnail

New York’s five-year construction spending boom could be slowing over the next two years

BD+C

Nonresidential construction spending in New York City is projected to reach $39 billion in 2018, a nearly 66% increase over the previous year. However, spending is also expected to tail off significantly during the following two years, according to a new report, Construction Outlook 2018-2020 , released today by the New York Building Congress.

article thumbnail

35-story mixed-use tower will be tallest residential building in Long Beach

BD+C

Designed as a companion building to The Current, a 17-story, 223-unit apartment tower, Shoreline Gateway has officially broken ground at its Ocean Blvd. and Alamitos Ave. location. When completed, the project will become the tallest residential building in Long Beach.

article thumbnail

Concrete Waterproofing: The Next Step to a More Resilient Design

Don’t let water wash away all your hard work. When specifying concrete waterproofing, you need a solution that’s reliable and permanent. Without it, your concrete waterproofing is at risk of failing and letting water erode and corrode the concrete that it was supposed to protect. Reduce the risk of waterproofing failure by reading through our latest free specification e-book, which will take you through the four key components to better concrete waterproofing specification.

article thumbnail

Construction begins on suburban Denver senior living facility

BD+C

A new senior living community, dubbed Atria Westminster, is currently under construction 10 miles northwest of Denver in Westminster, Colo. The OZ Architects-designed facility will offer 137 units across five stories.

article thumbnail

Philadelphia plumbing code will now allow for more use of plastic pipes in high rises

BD+C

After months of negotiation between residential builders and the plumbers union, Philadelphia is poised to allow the use of plastic pipes in high-rise residential construction. A memorandum of understanding hammered out by the Plumbing Advisory Board will be incorporated into the new building code next year. The City of Brotherly Love is one of only six major U.S. cities that still require the use of metal pipes in such projects.

article thumbnail

Federally-backed rebuilding of public buildings often leaves them vulnerable to future storms

BD+C

Analysis of federal data by the New York Times found that FEMA’s public assistance program has paid for many rebuild-in-place projects that leave the structures just as defenseless against future storms.

article thumbnail

Tesla purchases 210 acres in Shanghai with plans to build Gigafactory 3

BD+C

A few months ago, Tesla confirmed reports that the company was looking to establish a factory in Shanghai to better serve the Chinese market. On Oct. 17, Tesla announced it had secured the rights to a 210-acre piece of land in Lingang, Shanghai on which it will build Gigafactory 3.

article thumbnail

Sustainable Architecture: Design Green with the Client in Mind

Speaker: Pedro Clarke – Principal Architect at A+ Architecture, In Loco Program Director

Sustainability begins with a conversation, and acquiring customer buy-in is entirely dependent on how the conversation is framed. Clients may not see sustainability as a priority out of fear of operational costs and quality. While these are legitimate concerns, it is our responsibility as architects to listen and foster a collaborative culture that answers client issues while also reducing our carbon footprint.

article thumbnail

Global Green Tag production certification standard will launch in U.S. at end of year

BD+C

Global GreenTag International will launch its product certification standard and eco-labeling program in the U.S. later this year.

IT 53
article thumbnail

Architectural T-Shirts

Life of an Architect

There are currently 58 “draft” articles on my site – some are fairly recent and some go back years. There are any number of reasons why I hadn’t finish writing a particular post: Lost interest in the topic I found it boring so assumed everyone else would as well Didn’t have the images or graphics to support the content Lost momentum (this accounts for probably one third) Sometimes the creative process is cathartic and not intended for public consumption As we creep