Remove Clients Remove Development Remove Engineering Remove Site
article thumbnail

Mattaforma considers "plants as clients" for Public Records outdoor space

Deezen

To do so while limiting new construction, the team took advantage of several storage units already on the site, positioning them as both separators and inhabitable spaces for both humans and plants. The post Mattaforma considers "plants as clients" for Public Records outdoor space appeared first on Dezeen.

Client 96
article thumbnail

Al Khuwair Muscat Downtown and Waterfront Development by Zaha Hadid Architects

aasarchitecture

Oman’s Ministry of Housing and Urban Planning (MoHUP) has announced the masterplan for a reimagined waterfront development in downtown Muscat, the nation’s capital. Designed by Zaha Hadid Architects (ZHA), the $1.3bn Al Khuwair Muscat Downtown and Waterfront Development will span 3.3 million sqm and is set to revitalise the area.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

In Situ Studio creates HUUS house for sloped site in Raleigh

Deezen

Like other parts of the city, the area is experiencing a lot of new development and building renovations. Local firm In Situ Studio was charged with designing a contemporary residence for a couple – the husband is an electrical engineer, and the wife is a German and history teacher. Part of the HUUS house is sunken in the ground.

Site 143
article thumbnail

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

BD+C

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection 0 dbarista Mon, 11/27/2023 - 15:08 Engineers Private businesses and governments can now choose their new electric vehicle (EV) charger locations with data-driven precision. TREDLite EV makes a science out of site selection.”

Site 52
article thumbnail

Austin Maynard Architects develops "ethical housing" in inner-city Melbourne

Deezen

Located on a narrow infill site in Brunswick, Terrace House is a six storey "ethical housing" building containing 16 apartments and three ground-level shop units. The decision to self-develop was fuelled by the ambition to create homes that pioneer new thinking. Developer: Austin Maynard Architects. Fire engineer: Omnii.

article thumbnail

Construction reaches roof levels of landmark development above Hong Kong’s High Speed Rail West Kowloon Terminus by Zaha Hadid Architects

aasarchitecture

development above Hong Kong’s High Speed Rail West Kowloon Terminus. Adjacent to the West Kowloon Cultural District, the development connects established and emerging neighbourhoods with a network of public gardens and landscaped plazas. Construction works have reached roof level at the new 3.2 million sq.

Roofing 59
article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BD+C

Implementing an ‘asset drawdown strategy’ for site decarbonization Solidifying a decarbonization plan via an “asset drawdown strategy” that carefully considers both capital and operating costs represents a game-changing opportunity for existing properties to compete with new projects. is a complex system that delivers power as it is produced.

Site 98