Remove 2029 Remove Commercial Remove Landscape Remove Roofing
article thumbnail

MAD designs Nanhai Art Center to emulate "continuous wave of water"

Deezen

Once complete, it is intended to resemble moving water, with large roof eaves modelled on the traditional architecture of Lingnan, the region in which Guangdong is located. Read: MAD designs bamboo leaf-roofs for Anji Culture and Art Center The plan for Nanhai Art Center is arranged around a central axis.

Art 126
article thumbnail

MAD Architects unveils Nanhai Art Center

aasarchitecture

The semi-outdoor merges the central landscape of the lake with the programs, inviting the local communities to immerse themselves in the waterfront landscape. Commercial spaces are placed along the lake, radiating architectural texture to the lakeshore landscape belt. Landscape Consultant: Earthasia (Shanghai) Co.,

Art 59
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cobe and Lundén Architecture Company win competition for community and municipal building in Finland

aasarchitecture

The building is part of a larger masterplan for the so-called Espoon Keskus, one of five major urban centres in Espoo, creating a diverse neighbourhood with new residential buildings, commercial facilities, public transportation, and green urban spaces. Construction for Espoo House will begin in early 2026 and is expected to open in 2029.

article thumbnail

Zaha Hadid Architects wins competition for the development of Zugló City Centre

aasarchitecture

Developed in phases by Bayer Construct Group in Hungary, the project will begin construction early next year and is scheduled for completion in 2029. of new landscaped areas. The project will create one of the greenest and most sustainable neighborhoods on the Pest side of the capital. Image © Zaha Hadid Architects.

article thumbnail

Zentralklinikum Hochrhein, Albbruck, Baden-Württemberg

e-architect

The exemplary hospital building with around 360 beds should be completed in Albbruck by 2029 – as the centerpiece of the health park of the same name that is being realized simultaneously as a separate project. The staggering of the wards improves privacy and opens up more views into the landscape and, hence, enhances the healing environment.

Concept 53