Remove 2029 Remove Building Remove Developer Remove Real Estate
article thumbnail

SOM, Mithun sign on to deliver seven-building Munger Hall replacement at UCSB

Archinect

The two-phase project will deliver accommodations for 4,000 students by 2029, led by the new 2,140-bed San Benito complex that will be completed in time for Fall 2027 after a two-year construction. This led to the controversial self-design proposal for a mostly windowless 3,500-bed dorm building.

article thumbnail

MAD designs Nanhai Art Center to emulate "continuous wave of water"

Deezen

Encompassing 121,275 square metres, the mixed-use Nanhai Art Center will be divided into three buildings containing a theatre, museum and sports centre. It is scheduled to begin construction of the Nanhai Arts Center in 2024 with completion slated for 2029. Landscape consultant: Earthasia (Shanghai) Co.

Art 127
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

It shouldn’t take 17 years to build affordable housing

Brandon Donnelly

If you are the Los Angeles County Metropolitan Transportation Authority and you own excess land next to a transit line that you’ve just recently built, one possible option could be to give this land to a non-profit housing developer so that they can build some affordable housing. million to build. Time isn’t free.

Housing 40
article thumbnail

MAD Architects unveils Nanhai Art Center

aasarchitecture

The development is located in Nanhai Cultural District, the heart of the Guangdong-Hongkong-Macao Greater Bay Area, an important urban site that bridges the cities of Guangzhou and Foshan. The Nanhai Art Center resembles a continuous wave of water, with three main buildings looming underneath the floating sun canopy. Site Area: Approx.

Art 59
article thumbnail

Zentralklinikum Hochrhein, Albbruck, Baden-Württemberg

e-architect

The exemplary hospital building with around 360 beds should be completed in Albbruck by 2029 – as the centerpiece of the health park of the same name that is being realized simultaneously as a separate project. The building’s extensive use of heat recovery and reuse of the relatively large amount of exhaust heat is equally important.

Concept 53