Remove 2025 Remove Engineering Remove Estimating Remove Technology
article thumbnail

Maryland's Key Bridge Response - A Story of Resolve, Achievement and Reverse Engineering

Community Architect

Other key parties involved in the recovery are the Army Corps of Engineers and the Coast Guard. The estimate for the overall weight of the fallen bridge is 27,000 tons. The reverse engineering effort involves engineers from the U.S. Army Corps of Engineers, Navy Supervisor of Salvage, MDOT, private firms and the U.S.

article thumbnail

Solar cars will be "normal within 20 years" says Lightyear's head engineer

Deezen

According to Cornagliotti, who is Lightyear's lead solar engineer, solar-assisted cars like this will be "normal within 20 years" once mass production is scaled up and prices are brought down. The hope is that this fledging technology will help to close the efficiency gap between cars running on fuel and those running on electricity.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Joe Doucet's Airiva wind turbines are made for city streets and buildings

Deezen

The current version of the design is the result of two years of engineering, development and testing, with the key change being to the shape and size of the blades. The company plans to conduct customer pilots in the second half of 2024, with the aim of taking the first orders in 2025.

Cities 138
article thumbnail

Dezeen's top 10 innovative materials of 2023

Deezen

Their Colorifix technology uses bacteria that is genetically engineered to produce different colour-making enzymes, creating a dyestuff that is compatible with the textile industry's standard dye machines. We've essentially figured out a low-energy way to treat a building like a person," said materials engineer Po-Chun Hsu.

Materials 133
article thumbnail

Competitions: Construction of an Innovation Campus - iXcampus

Bustler

Today iXcampus is taking on a new challenge: to double the surface area of the campus in order to accommodate 1,200 students and 900 employees in 2025. estimated envelope : € 40,000,000 surface to create : 16,000 sqm Read the full post on Bustler.

article thumbnail

7 key predictions for the 2024 multifamily rental housing market

BD+C

But because of the lengthy development cycle of multifamily projects, this slowdown won’t be reflected in apartment completions until 2025. 2023 is set to have the second slowest rent growth of any year in the history of our estimates (going back to 2017), coming ahead of only 2020. 2 – Expect low single-digit rent growth in 2024.

Housing 59
article thumbnail

7 key predictions for the 2024 multifamily rental housing market

BD+C

But because of the lengthy development cycle of multifamily projects, this slowdown won’t be reflected in apartment completions until 2025. 2023 is set to have the second slowest rent growth of any year in the history of our estimates (going back to 2017), coming ahead of only 2020. 2 – Expect low single-digit rent growth in 2024.

Housing 52