Remove 2025 Remove Diagram Remove Site Remove Sustainability
article thumbnail

MAD completes the “Train Station in the Forest”

aasarchitecture

Located at the center of Jiaxing, a historic city 100 kilometers southwest of Shanghai, the project replaces a dysfunctional train station that had stood at the site between 1995 and 2019. It is expected that by 2025, the full passenger capacity will reach 5.28

article thumbnail

DESMAN Headquarters in Hangzhou by Aedas

aasarchitecture

It is slated to resonate with the sustainable urban development and ecological system in the vicinity. Layout diagram Location: Hangzhou, China Architect: Aedas Client: DESMAN (China) Machinery & Electronic Co., Gross Floor Area: 63,032 sq m Completion Year: 2025 Images: Courtesy of Aedas Site Section Section

Diagram 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Schmidt Hammer Lassen wins competition for transformation and expansion of Helsingborg Library

aasarchitecture

Schmidt Hammer Lassen’s winning proposal draws inspiration from the site’s inherent spatial, material, and immaterial qualities and its unique location in Stadsparken. They are the cultural heritage of the future and must therefore embody sustainability for future generations. Source by Schmidt Hammer Lassen.

Diagram 59
article thumbnail

MAKERS’ KUbe by BIG and University of Kansas School of Architecture & Design

aasarchitecture

” Along with housing studio space, the KUbe will also serve as a teaching tool, showcasing sustainable practices through its mass timber diagrid design. Any rainwater accumulated on the KUbe’s roof is stored and used for irrigating the site’s landscaping, which features native species that further reduce water needs.

article thumbnail

Innovation Partnership School Buildings by OMA

aasarchitecture

Amsterdam will halve the use of primary raw materials by 2030 and become fully circular by 2050 – according to the Circular Strategy 2020-2025 proposed by the municipality. All the components are precisely made in the factory under a digitally controlled process to ensure fast assembly and disassembly by an electric crane on site.

article thumbnail

Solar Cupola by BIG wins design competiton for New European Commission Research Center

aasarchitecture

BIG’s design proposal for the Joint Research Centre in Seville inspired by the architectural vernacular of the southern Spanish city, delivers on JRC’s commitment to sustainability, unites the European vision of the New Bauhaus initiative, and establishes a new benchmark for workspace that empowers knowledge sharing, collaboration and co-creation.

Diagram 52
article thumbnail

Ecopolis by TSPA

aasarchitecture

The 600-mile-long island plans to be Russia’s first carbon neutral region by 2025. To develop the city, TSPA partnered with Wowhaus (RU), Nomura Research Institute (JP), and the Scientific Research Institute of Ecology and Sustainable Management of Natural Resources (RU). Circularity diagram. Master Plan.

Diagram 52