Remove 2025 Remove Construction Remove Structural Engineering Remove Sustainability
article thumbnail

LAX Midfield Satellite Concourse South project has topped out in Los Angeles

Archinect

LAX 's new Midfield Satellite Concourse South (or MSC South) recently topped out as the project's construction progresses in nine segments toward its 2025 completion date.

Project 203
article thumbnail

A Visionary Lighthouse: Kuwait’s Expo 2025 Osaka Pavilion by NUSSLI, LAVA, and insglück

aasarchitecture

The architecture and exhibition of the Kuwait Pavilion at the upcoming World Expo 2025 in Osaka, Japan were unveiled to the public today at a ceremony in Tokyo, Japan. With its ninth Expo participation, the company is drawing on extensive expertise in all aspects of national presentations and, in particular, with Expo pavilions.

Concept 83
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

New childcare center at Munich’s Technical University by Kéré Architecture

aasarchitecture

From the end of 2025, there will be space for 60 children with 700 square meters at their disposal. This is aimed at minimizing the building’s carbon footprint while maintaining simple and high-quality construction in line with the philosophy of Kéré Architecture. Source by Kéré Architecture. KG, Munich Energy efficiency: TUM Prof.

article thumbnail

MAD unveils sunken Train Station in the Forest in Jiaxing

Deezen

million people a year by 2025, was increased from five tracks to six tracks. Through careful traffic planning and employing a vertical use of space, our scheme meets the station's existing passenger demand while leaving room for future sustainable development and expansion," it added.

article thumbnail

University High School California Street Campus by Leddy Maytum Stacy Architects

aasarchitecture

The California Street Campus is targeting Net -Zero Energy, becoming a teaching tool for a sustainable future. Under construction, the project’s estimated completion date is Spring 2025. Source by Leddy Maytum Stacy Architects.

article thumbnail

Ground granulated blast furnace slag in concrete production

e-architect

GGBS in concrete production A group of 13 experts from across structural engineering, concrete and cement industries, construction, academia, and civil society have collaborated on a paper that reviews the use of ground granulated blast furnace slag (GGBS) in concrete, and examining ways that this may change in the future.

article thumbnail

Covestro Headquarters by HENN

aasarchitecture

HENN’s design functions as an accelerator: a space to inspire and support the future-oriented solutions of the company as it addresses issues of sustainability and moves towards a circular economy. The headquarters is part of the HENN-designed Covestro Campus, which will be completed in 2025. Photo © HGEsch.