Remove 2025 Remove Cities Remove Construction Remove Developer
article thumbnail

Foster + Partners unveils Saudi Arabia pavilion for Expo 2025 Osaka

Deezen

British architecture studio Foster + Partners has released visuals of its design for the Saudi Arabia pavilion at Expo 2025 Osaka , which will be modelled on the kingdom's traditional villages. The post Foster + Partners unveils Saudi Arabia pavilion for Expo 2025 Osaka appeared first on Dezeen.

article thumbnail

Gensler’s Culver Crossings Apple campus proposal goes under the planning microscope in Culver City

Archinect

Apple, currently the world's most valuable company based on market capitalization, faces a key test in its bid to construct a new office campus in Southern California, when the project goes before the Culver City Planning Commission this week for consideration. acre site at Venice and National Boulevards.

Cities 246
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Shigeru Ban unveils triple-domed Expo 2025 Osaka pavilion

Deezen

Japanese architect Shigeru Ban has given Dezeen an exclusive look at his design for the Expo 2025 Osaka , an undulating pavilion that will be built from paper tubes, bamboo and carbon-fibre reinforced plastic. It will be located on reclaimed land in Yumeshima, Osaka , where the World Expo 2025 will be held.

article thumbnail

One Beverly Hills by Foster + Partners Breaks Ground

ArchDaily

Courtesy of Foster + Partners Foster + Partners has announced the start of construction on One Beverly Hills, revitalizing 17.5 acres of land in the city center. Proposing two residential buildings, a new hotel, a dining, and a retail pavilion, the development is expected to open in 2025.

article thumbnail

Chicago issues caisson permit for 400 Lake Shore Drive

Archinect

An important milestone has been reached in the construction of 400 Lake Shore Drive in Chicago. The blog reports that once that work is done, "above-grade work will start in Q1 2025 and continue through Q2 2027. The project had previously set a date for around December 1st for its construction to start.

Permits 250
article thumbnail

SOM-designed towers planned atop Chicago Spire site finally set to begin construction this year

Archinect

Construction is set to start later this year at 400 Lake Shore Drive after more than a decade as an empty plot. Left as a mere hole in the ground, the site was acquired in 2014 by developer Related Midwest with a proposal to build two sister luxury apartment towers. acre reimagined space set to be completed in 2025.

Site 224
article thumbnail

2025 Aga Khan Award for Architecture news

e-architect

2023-2025 Aga Khan Award for Architecture Steering Committee: photo © Justin Knight, courtesy of the Aga Khan Award for Architecture Newly appointed members of the Steering Committee are: Meisa Batayneh , Principal Architect, Founder, maisam architects and engineers, Amman, Jordan.